Re: A85: 82-85
[Prev][Next][Index][Thread]
Re: A85: 82-85
On Fri, 3 Jul 1998, Sami Khawam wrote:
>
> Hi,
>
> To Humberto:
>
> Can you please send me those routines to check
> if they work well with the IR Link? Because sometimes
> in the recieve routine a small time-outed loop
> that check if both lines are high should be added
> at the end ( Like in Randy Gluvna 's recieve
> routine that I am using in IR Chat,IR Remote,IR_TTT...).
>
> Thanks.
>
I Already uploaded them to Ticalc.org They should be in Assembly source
Other.
My routines are based on Pascal Bouron's routines. I changed a lot but
the protocal is the same. His routines required a testON routine (error
counter), I looked at Ztetris for that. I just put it all together and
optimized it.. a lot. And I added the carry=error thing.
As I said before I tested it between my 85 & 82 with a link cable, if the
IR Link works the same then it should work.
Good luck.
-Humberto Yeverino Jr.
"I kick ass for the Lord."
http://www.engr.csufresno.edu/~humberto/Home.html
humberto@engr.csufresno.edu
<font size=3>For browsers:<br>
<a href="http://www.engr.csufresno.edu/~humberto/Home.html">
Have a look.</a></font><br>
References: